skip_to_main_content
VisitSønderborg

Bridge closing week 42 - 2021

King Christian d. X´s Bridge is closed to all types of traffic 18 -24 October 2021

The bridge flaps on King Christian X´s Bridge in Sønderborg C is open 24/7 in the period 18 October (00:00) - 24 October (23:59) 2021 and can thus not be passed by pedestrians, cyclists and other vehicles.

Pedestrians are referred to the free shuttle buses:

Departure from Alsion / Banegården - Point 1:

05:30 - 00:00: Half-hour operation with departure minutes 00 and 30

00:00 - 05:00: Hourly operation with departure minute 00 (ie 01, 02, 03, 04 and 05)

Departure from the Harbour Office - Point 2:

05:15 - 23:45 Half-hour operation with departure minutes 15 and 45

00:00 - 05:00: Hourly operation with departure minute 30 (ie 00.30, 01:30, 02:30, 03:30 and 04:30)

The bus can carry up to four bicycles at a time. The first-come, first-served principle applies. Bicycles are placed at your own risk in the trunk of the bus.


Cyclists are referred to the free bicycle ferry:

Departure from the mainland side, the quay at Udos Fisk, Sundgade 5 - Point 3:

Minutes 00 and 30. First turn at. 6.00, last trip at. 19.30.

Departure from the Als side, the quay at the Harbour Office, Nørre Havnegade 1A - Point 2:

Minutes 15 and 45. First trip at. 6.15, last trip at 19.45.

NB. At peak loads, sailing is continuous, more frequently than every 15 minutes.

The bicycle ferry sails every day in the period between kl. 06.00 - 20.00.

12 bicycles and 12 passengers can be carried. The first-come, first-served principle applies. Cyclists have priority. Non-cyclists can only use the bicycle ferry if there is available capacity.